The Investor Manifesto
Advertisement
  • Business
  • Politics
  • Investing
  • Stocks
No Result
View All Result
  • Business
  • Politics
  • Investing
  • Stocks
No Result
View All Result
The Investor Manifesto
No Result
View All Result
Home Investing

Galan Increases Total Mineral Resource by 18% to 8.6Mt LCE @ 859mg/L Lithium

March 28, 2024
in Investing
Galan Increases Total Mineral Resource by 18% to 8.6Mt LCE @ 859mg/L Lithium
0
SHARES
3
VIEWS
Share on FacebookShare on Twitter

Galan Lithium Limited (ASX:GLN) (Galan or the Company) is pleased to announce a further consolidating increase to its JORC (2012) reported Mineral Resource estimate for the Hombre Muerto West Project (HMW Project) located in Catamarca Province, Argentina. The revised Mineral Resource estimate was completed by a team of leading independent geological consultants, WSP Chile (WSP).

Galan’s 100% owned Mineral Resources increase to 8.6Mt contained lithium carbonate equivalent (LCE) @ 859mg/L Li (previously 7.3Mt LCE @852mg/L Li)One of the highest grade resource estimates declared in ArgentinaInclusion of Catalina tenure adds ~1.3Mt LCE to the HMW ResourceHMW Measured Resource of 4.7Mt contained LCE @ 866mg/L LiGalan’s fourth significant resource upgrade since March 2020Resource upgrade cements Galan’s fully owned resource base and adds flexibility, optionality and leverage to any Li price upswing and supports Galan’s 4 stage long term production target of 60ktpa LCE (including Candelas)

The maiden HMW Project Mineral Resource Estimate (refer Galan ASX release dated 12 March 2020) was prepared by SRK and was further upgraded on 17 November 2020, 24 October 2022 and 1 May 2023. Each upgrade has not only significantly increased the Total Resource inventory but also enhanced the Resource category classifications and hence confidence in the viability and robustness of the HMW project. This latest resource upgrade enhances Galan’s objective to achieve the necessary production conditions for Stage 3 (40Ktpa LCE), towards our four-stage lithium production target of up to 60ktpa LCE (including Candelas).

No cut-off grade applied to the updated Mineral Resource Estimate.There may be minor discrepancies in the above table due to rounding.The conversion for LCE = Li x 5.3228, KCl = K x 1.907.

(*) Candelas North tenements are located about 40 km to the Southeast of the HMW Project. The Candelas North Mineral Resource Statement was originally announced by Galan on 1 October 2019.

Commenting on the significant Resource upgrade, Galan’s Managing Director, Juan Pablo (JP) Vargas de la Vega, said:

“This latest significant upgrade in the high grade, low impurity HMW Resource highlights the potential enormity of the brine resource that sits within Galan’s 100% owned tenements in Argentina. The initial HMW resource in March 2020 was 1.08Mt LCE @ 946mg/L Li, upgraded in May 2023 to 6.6MT LCE @ 880mg/L Li. This has now been increased a further ~20% to a tier one size of 8.6Mt LCE at 859mg/L Li, with the inclusion of our Catalina tenements. Coupled with our Candelas resource, Galan has a very solid foundation, and more importantly has delivered a further validation that its Hombre Muerto Salar resources fully support our four-stage lithium production target of up to 60ktpa LCE.

The HMW Project is robust and underpinned by strong financial metrics as illustrated in its Stage 1 and Stage 2 DFS results. We constantly evaluate opportunities to increase the value of the HMW Project in parallel with continuing to construct Stage 1 as we look forward to first commercial production in 1H 2025.”

Summary of Resource Estimate and Reporting Criteria

The Mineral Resource Estimate (MRE) for lithium (reported as Li2CO3 equivalent) and potassium (KCl equivalent) were completed by WSP (Chile). This updated MRE incorporates geological and geochemical information obtained from thirty one (31) drillholes totalling 9,043 metres within the Pata Pila, Rana de Sal I, Rana de Sal II, Casa del Inca III, Catalina, Del Condor, Pucara del Salar, Delmira, Don Martin, El Deceo I, El Deceo II, El Deceo III and Santa Barbara tenements (see Figure 1). A total of 697 brine assays were used as the foundation of the estimate, all of which were analysed at Alex Stewart International laboratory (Jujuy, Argentina). The QA/QC program includes duplicates, triplicates, and standards, In total, 376 QA/QC samples were considered using Alex Stewart (duplicates) and SGS in Argentina (triplicates) as the umpired laboratory.

Click here for the full ASX Release

This post appeared first on investingnews.com

Previous Post

First Nations Engagement Key as Critical Minerals Boom Sweeps Canada

Next Post

In abortion pill arguments, Supreme Court justices seem skeptical about FDA accountability experts say

Next Post
In abortion pill arguments, Supreme Court justices seem skeptical about FDA accountability experts say

In abortion pill arguments, Supreme Court justices seem skeptical about FDA accountability experts say

    Get free access to all of the retirement secrets and income strategies from our experts! or Join The Exclusive Subscription Today And Get the Premium Articles Acess for Free


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent News

    Use This Multi-Timeframe MACD Signal for Precision Trades

    Use This Multi-Timeframe MACD Signal for Precision Trades

    May 8, 2025
    The Unpredictable Stock Market: How to Make Sense of It

    The Unpredictable Stock Market: How to Make Sense of It

    May 8, 2025
    Trump offers to help India, Pakistan amid growing conflict: ‘I want to see them stop’

    Trump offers to help India, Pakistan amid growing conflict: ‘I want to see them stop’

    May 8, 2025
    Lone Republican becomes only lawmaker to vote against crackdown on human organ trafficking

    Lone Republican becomes only lawmaker to vote against crackdown on human organ trafficking

    May 8, 2025
    Disclaimer: TheInvestorManifesto.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Popular

    Bullish Percent Index Confirms Short-Term Rebound
    Stocks

    Bullish Percent Index Confirms Short-Term Rebound

    April 15, 2025

    Read more

    Recent News

    Use This Multi-Timeframe MACD Signal for Precision Trades

    Use This Multi-Timeframe MACD Signal for Precision Trades

    May 8, 2025
    The Unpredictable Stock Market: How to Make Sense of It

    The Unpredictable Stock Market: How to Make Sense of It

    May 8, 2025
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Copyright © 2025 theinvestormanifesto.com | All Rights Reserved

    No Result
    View All Result
    • Business
    • Politics
    • Investing
    • Stocks

    Copyright © 2025 theinvestormanifesto.com | All Rights Reserved